Sunday 12 January 2014

Filming Log

10/01/14: This was the day on which we started filming, we all met at the setting location which was my house. We went over what we was going to film and reminded Zak (main actor) of what he should be doing in each scene and prepared all the props we needed. We actually managed to get half of the filming done in one day, we could have possibly filmed more had it not been dak outside once we had finished filming inside the house. If we had thought about the order in which we shot out scenes this could have been avoided. However this was not a huge set back.

11/01/14: On the second day once again we all met at my house. When the whole group was together we again ran through the course of the days filming. We filmed all of the outside scenes and then we also had the chance to go back and mend mistakes, re-shoot shots etc. This was helpful as we had some shots which were blurry, unsteady and too much background noise.

No comments:

Post a Comment